Pages

Friday, March 30, 2012

Tugas 4 - Akuntansi Keuangan 2

Sebuah Mesin Potong Janggut memiliki harga perolehan Rp. 10.000.000,- dan umur ekonomis ditaksir 5 tahun, dari data tersebut maka hitunglah penyusutan dengan menggunakan :

- Metode jumlah angka tahun
- Metode saldo menurun
- Double declining balance method

Keep Happy Learning !!!

Sunday, March 25, 2012

Hasil Balapan GP Malaysia 2012

Hasil Akhir Lengkap F1 GP Malaysia, Sirkuit Sepang:

Alonso Ferrari 2h44:51.812
Perez Sauber-Ferrari + 2.263
Hamilton McLaren-Mercedes + 14.591
Webber Red Bull-Renault + 17.688
Raikkonen Lotus-Renault + 29.456
Senna Williams-Renault + 37.667
Di Resta Force India-Mercedes + 44.412
Vergne Toro Rosso-Ferrari + 46.985
Hulkenberg Force India-Mercedes + 47.892
Schumacher Mercedes + 49.996
Vettel Red Bull-Renault + 1:15.527
Ricciardo Toro Rosso-Ferrari + 1:16.826
Rosberg Mercedes + 1:18.593
Button McLaren-Mercedes + 1:19.719
Massa Ferrari + 1:37.319
Petrov Caterham-Renault + 1 lap
Glock Marussia-Cosworth + 1 lap
Kovalainen Caterham-Renault + 1 lap
Maldonado Williams-Renault + 2 laps
Pic Marussia-Cosworth + 2 laps
Karthikeyan HRT-Cosworth + 2 laps
De la Rosa HRT-Cosworth + 2 laps

Tidak Finish

Kobayashi Sauber-Ferrari
Grosjean Lotus-Renault

GP Malaysia - Sementara Balapan Terhenti di Lap Kesembilan

Rossi Finza Noor - detiksport
Minggu, 25/03/2012 15:43 WIB
Sepang - Balapan F1 GP Malaysia sementara berhenti di lap kesembilan. Hujan yang mengguyur Sirkuit Sepang menjadi alasan dihentikannya balapan tersebut.

Pada balapan yang berlangsung Minggu (25/3/2012) sore WIB, hujan rintik-rintik memang sudah tampak mengguyur menjelang balapan dimulai. Namun, semakin bertambah deras ketika balapan dimulai.

Para pebalap pun satu per satu masuk ke dalam pit untuk mengganti ban ketika trek mulai basah. Termasuk di antaranya adalah Felipe Massa, Jenson Button, dan Fernando Alonso.

Tepat pada lap ketujuh, safety car pun masuk ke dalam lintasan. Namun, ketika itu, red flag belum dikibarkan.

Sampai akhirnya dua lap kemudian bendera merah itu benar-benar dikibarkan dan balapan pun dihentikan sementara. Hujan deras sampai saat ini masih terus mengguyur Sepang.

Ketika balapan dihentikan, Lewis Hamilton masih berada di urutan terdepan dengan diikuti Button, Sergio Perez, Mark Webber, Alonso, dan Sebastian Vettel.

Michael Schumacher, yang start dari urutan ketiga, sempat tergelincir di awal-awal balapan dan akhirnya berada di urutan 15 ketika safety car masuk ke lintasan.

Romain Grosjean menjadi satu-satunya pebalap yang sudah out setelah mobilnya keluar lintasan pada lap ketiga.

www.detik.com

Saturday, March 24, 2012

Jadwal MOTOGP 2012

COMMERCIALBANK GRAND PRIX OF QATAR
8 April 2012 | Losail Circuit | Qatar

GRAN PREMIO bwin DE ESPAÑA
29 April Jerez | Spanyol

GRANDE PREMIO DE PORTUGAL
6 Mei 2012 | Estoril | Portugal

MONSTER ENERGY GRAND PRIX DE FRANCE
20 Mei 2012 | Le Mans | Perancis

GRAN PREMI APEROL DE CATALUNYA
3 Juni 2012 | Circuit de Catalunya | Catalunya

BRITISH GRAND PRIX
17 Juni 2012 | Silverstone | Inggris

IVECO TT ASSEN
30 Juni 2012 | Assen | Belanda

eni MOTORRAD GRAND PRIX DEUTSCHLAND
8 Juli 2012 | Sachsenring | Jerman

GRAN PREMIO D’ITALIA TIM
15 Juli 2012 | Mugello | Italia

RED BULL U.S. GRAND PRIX
29 Juli 2012 | Mazda Raceway | Amerika Serikat

RED BULL INDIANAPOLIS GRAND PRIX
19 Agustus 2012 | Indianapolis | Amerika Serikat

bwin GRAND PRIX CESKE REPUBLIKY
26 Agustus 2012 | Automotodrom Brno | Republik Ceko

GP APEROL DI SAN MARINO E DELLA RIVIERA DI RIMINI
16 September 2012 | Misano | San Marino

GRAN PREMIO IVECO DE ARAGÓN
30 September 2012 | Motorland Aragon | Aragon

GRAND PRIX OF JAPAN
14 Oktober 2012 | Motegi | Jepang

AUSTRALIAN GRAND PRIX
28 Oktober | Phillip Island | Australia

GRAN PREMIO GENERALI DE LA COMUNITAT VALENCIANA
11 November 2012 | Comunitat Valenciana | Spanyol


Wilujeng ngabandungan....!!!

Friday, March 23, 2012

Tugas 3 - Akuntansi Keuangan 2

PT. Galau Sendiri mengasuransikan harta perusahaannya ke 3 perusahaan asuransi dengan pembagian sebagai berikut :
• Perusahaan Asuransi A = $ 2.000,-
• Perusahaan Asuransi B = $ 1.500,-
• Perusahaan Asuransi C = $ 1.000,-
Suatu hari sebagian hartanya terbakar sehingga mengalami kerugian sebesar Rp 25.000.000,- harga pasar barang tersebut pada saat kebakaran adalah $ 2.000,-
Dengan asumsi kurs dollar sebesar Rp. 10.000 per USD hitunglah berapa kerugian yang harus dibayar masing-masing perusahaan asuransi dengan ketentuan :
a. Apabila polis tanpa syarat asuransi bersama.
b. Apabila semua coinsurancenya 75%
c. Apabila masing-masing memiliki coinsurance sendiri A=75%, B=80%, C=85%


PT. Kejarlah Daku Kau Kujitak. Memiliki mesin dengan nilai Rp. 2.000.000,- biaya pengadaan dan lainnya Rp 500.000,- nilai sisanya diperkirakan sebesar Rp. 500.000,-. Kapasitas produksi 10.000 jam atau setara dengan 25.000 unit.
Hitunglah penyusutan aktiva tersebut dengan ketentuan
a. Masa manfaat 5 tahun, hitung dengan SLM
b. Tahun ke satu dan seterusnya 1000, 3000, 3000, 2000, 1000 jam
c. Tahun ke satu dan seterusnya 2500, 3000, 4000, 5500, 6000, 4000 unit

Tuesday, March 20, 2012

Sempurna

Kadang ada orang yang menuntut kesempurnaan atas segala sesuatunya, sehingga dia sering mencela atas ketidaksempurnan sesuatu tersebut. Padahal kesempurnaan yang Hakiki hanya milik Allah, ada istilah "Nobody's Perfect", itulah faktanya, jadi belajarlah mensyukuri ketidaksempurnaan itu, karena sesungguhnya ketidaksempurnaan itulah kesempurnaan kita...




By Sarif Hidayat


Saturday, March 17, 2012

Jadwal Formula 1 2012

Buat penggila balapan Formula1,  berikut jadwal Formula 1 terbaru, jadwal lengkap F1, siaran langsung jadwal F1 2012 di Global TV tanggal dan jam tayang, lokasi sirkuit resmi F1, informasi balap mobil terlengkap paling baru dibahas di halaman ini. F1 tahun 2012 ini dibagi menjadi 20 sirkuit di berbagai negara.

  1. MELBOURNE
    Race Date: 18 Mar 2012
    Circuit Name: Albert Park
    Number of Laps: 58
    Circuit Length: 5.303 km
    Race Distance: 307.574 km
    Lap Record: 1:24.125 - M Schumacher (2004)
  2. KUALA LUMPUR
    Race Date: 25 Mar 2012
    Circuit Name: Sepang International Circuit
    Number of Laps: 56
    Circuit Length: 5.543 km
    Race Distance: 310.408 km
    Lap Record: 1:34.223 - JP Montoya (2004)
  3. SHANGHAI
    Race Date: 15 Apr 2012
    Circuit Name: Shanghai International Circuit
    Number of Laps: 56
    Circuit Length: 5.451 km
    Race Distance: 305.066 km
    Lap Record: 1:32.238 - M Schumacher (2004)
  4. SAKHIR
    Race Date: 22 Apr 2012
    GLOBAL TV: 19.00 WIB
    Circuit Name: Bahrain International Circuit
    Number of Laps: 57
    Circuit Length: 5.412 km
    Race Distance: 308.238 km
    Lap Record: 1:30.252 - M Schumacher (2004)
  5. CATALUNYA
    Race Date: 13 May 2012
    Circuit Name: Circuit de Catalunya
    Number of Laps: 66
    Circuit Length: 4.655 km
    Race Distance: 307.104 km
    Lap Record: 1:21.670 - K Raikkonen (2008)
  6. MONTE CARLO
    Race Date: 27 May 2012
    GLOBAL TV: 19.00 WIB
    Circuit Name: Circuit de Monaco
    Number of Laps: 78
    Circuit Length: 3.340 km
    Race Distance: 260.520 km
    Lap Record: 1:14.439 - M Schumacher (2004)
  7. MONTREAL
    Race Date: 10 Jun 2012
    Circuit Name: Circuit Gilles-Villeneuve
    Number of Laps: 70
    Circuit Length: 4.361 km
    Race Distance: 305.270 km
    Lap Record: 1:13.622 - R Barrichello (2004)
  8. VALENCIA
    Race Date: 24 Jun 2012
    GLOBAL TV: 19.00 WIB
    Circuit Name: Valencia Street Circuit
    Number of Laps: 57
    Circuit Length: 5.419 km
    Race Distance: 308.883 km
    Lap Record: 1:38.683 - T Glock (2009)
  9. SILVERSTONE
    Race Date: 08 Jul 2012
    GLOBAL TV: 19.00 WIB
    Number of Laps: 52
    Circuit Length: 5.891 km
    Race Distance: 306.198 km
    Lap Record: 1:30.874 - F Alonso (2010)
  10. HOCKENHEIM
    Race Date: 22 Jul 2012
    Circuit Name: Hockenheimring
    Number of Laps: 67
    Circuit Length: 4.574 km
    Race Distance: 306.458 km
    Lap Record: 1:13.780 - K Raikkonen (2004)
  11. BUDAPEST
    Race Date: 29 Jul 2012
    GLOBAL TV: 19.00 WIB
    Circuit Name: Hungaroring
    Number of Laps: 70
    Circuit Length: 4.381 km
    Race Distance: 306.630 km
    Lap Record: 1:19.071 - M Schumacher (2004)
  12. SPA-FRANCORCHAMPS
    Race Date: 02 Sep 2012
    Circuit Name: Circuit de Spa-Francorchamps
    Number of Laps: 44
    Circuit Length: 7.004 km
    Race Distance: 308.052 km
    Lap Record: 1:45.108 - K Raikkonen (2004)
  13. MONZA
    Race Date: 09 Sep 2012
    Circuit Name: Autodromo di Monza
    Number of Laps: 53
    Circuit Length: 5.793 km
    Race Distance: 306.720 km
    Lap Record: 1:21.046 - R Barrichello (2004)
  14. SINGAPORE
    Race Date: 23 Sep 2012
    Circuit Name: Marina Bay Street Circuit
    Number of Laps: 61
    Circuit Length: 5.073 km
    Race Distance: 309.316 km
    Lap Record: 1:45.599 - K Raikkonen (2008)
  15. SUZUKA
    Race Date: 07 Oct 2012
    GLOBAL TV: 13.00 WIB
    Number of Laps: 53
    Circuit Length: 5.807 km
    Race Distance: 307.471 km
    Lap Record: 1:31.540 - K. Raikkonen (2005)
  16. YEONGAM
    Race Date: 14 Oct 2012
    Circuit Name: Korea International Circuit
    Number of Laps: 55
    Circuit Length: 5.615 km
    Race Distance: 308.630 km
    Lap Record: 1:39.605 - S Vettel (2011)
  17. NEW DELHI
    Race Date: 28 Oct 2012
    Circuit Name: Buddh International Circuit
    Number of Laps: 60
    Circuit Length: 5.125 km
    Race Distance: 307.249 km
    Lap Record: 1:27.249 - S Vettel (2011)
  18. YAS MARINA
    Race Date: 04 Nov 2012
    Number of Laps: 55
    Circuit Length: 5.554 km
    Race Distance: 305.355 km
    Lap Record: 1:40.279 - S Vettel (2009)
  19. AUSTIN
    Race Date: 18 Nov 2012
    Circuit Name: Circuit of The Americas
    Number of Laps: 56
    Circuit Length: 5.516 km
    Race Distance: 308.896 km
    Lap Record: -
  20. SAO PAULO
    Race Date: 25 Nov 2012
    Circuit Name: Autodromo Jose Carlos Pace
    Number of Laps: 71
    Circuit Length: 4.309 km
    Race Distance: 305.909 km
    Lap Record: 1:11.473 - JP Montoya (2004)
Saksikan Keseruannya.....

Wisdom for Today

Seringkali kita mengeluh dan berkeluh kesah atas ketidaksesuaian antara harapan dan kenyataan, tanpa kita sadari sesungguhnya dibalik setiap kejadian pasti ada pelajaran yang mesti kita petik. Ketika seorang menginginkan seekor binatang yang indah, Tuhan hanya memberi dia seekor ulat bulu yang menurutnya tidak terlalu indah bahkan cenderung jelek, namun ketika waktu berjalan dan sang ulatpun berubah menjadi seekor kupu-kupu, barulah orang tersebut mengerti kenapa dulu Tuhan memberi dia Ulat ketimbang binatang yang lain...
jadi tetap sabar dan terus bertawakal, karena di setiap perjuangan pasti akan menghasilkan sesuatu yang lebih berguna bahkan dari apa yang kita harapkan...
Keep Trying......


By Sarif Hidayat

Friday, March 16, 2012

Tugas 2 - Akuntansi Keuangan 2

  • PT Penantian Yang Tak Berujung menukarkan mesin tenunnya dengan mobil baru. Mesin tenun tersebut mempunyai harga perolehan sebesar Rp. 2.500.000,00 akumulasi depresiasi sampai tanggal pertukaran sebesar Rp. 2.000.000,00. Nilai wajar mesin tenun tersebut sebesar Rp. 600.000,00. dan  PT Penantian Yang Tak Berujung harus membayar sebesar Rp. 1.700.000,00.
  1. Hitunglah Laba / Rugi pertukaran tersebut 
  2. Buatlah jurnalnya!
  • PT Mesindo Qien Perkasa menukar sepeda merek X dengan sepeda baru merek Y. Harga perolehan sepeda X sebesar Rp. 25.000.000,00 dan akumulasi penyusutannya sebesar Rp. 15.000.000,00. Harga pasar sepeda Y Rp. 40.000.000,00. PT Mesindo Qien Perkasa membayar tunai sebesar Rp. 35.000.000,00.
  1. Buatlah Perhitungannya !
  2. Buatlah Jurnal dari transaksi tersebut  !
  •  Sebuah mesin diasuransikan sebesar Rp. 3.000.000,00. Pada suatu malam mesin tersebut terbakar sehingga kerugian yang timbul sebesar Rp. 2.500.000,00. Pada saat kebakaran mesin tersebut memiliki harga pasar Rp. 3.500.000,00. 
  1. Hitunglah berapa kerugian yang harus ditanggung oleh pihak perusahaan dan pihak asuransi jika  Coinsurance yang berlaku sebesar  85%. 

Thursday, March 15, 2012

Lowongan Kerja

Special buat Alumi STIE Muttaqien

Bank Pundi sedang membutuhkan karyawan dengan syarat-syarat sebagai berikut :
  • Pendidikan S1
  • Umur Max 25 tahun
  • IPK min 2.75
klo berminat bisa kontek saya.

Thanks and good luck

Sunday, March 11, 2012

Perubahan Jadwal Kuliah

Jadwal Kuliah Akuntansi Keuangan II yang tadinya setiap hari Selasa jam ke 2 berubah menjadi hari Senin jam ke 2

Don't miss it!